Metro Residences – Exclusive new construction project in the heart of Curaçao
Metro Residences is a leading new development consisting of 96 luxury apartments spread across six modern residential buildings. Located on Kaya Andruw RB Jones #9, near Sentro Deportivo Kòrsou, this project offers a safe, comfortable, and stylish living environment in a central location on Curaçao. Here, quality, sustainability, and contemporary architecture come together harmoniously.
The complex boasts a wide range of amenities, including a large communal swimming pool, a fully equipped gym, a mini paddle tennis court, a mini basketball court, and 24/7 security. All buildings have elevators, and each apartment has at least one private parking space, depending on the type.
All apartments are delivered turnkey and are equipped as standard with:
• High-quality porcelain tiles
• European aluminum windows with double glazing
• Luxury kitchen with cooking island, granite worktop and built-in appliances
• Bathrooms with quality sanitary facilities and walk-in shower
• Bedrooms with custom-made wardrobes
• Air conditioning in all rooms
Available apartment types
Type A – 2 bedrooms – approx. 100 m² (32 apartments)
Type B – 3 bedrooms – approx. 120 m² (48 apartments)
Type C – 4 bedrooms – approx. 140 m² (16 apartments)
Features
- Located in a secure residential area
- High-quality turnkey finish
- Spacious living room with direct access to the outdoor area
- Bedrooms with en-suite bathrooms
- Separate guest toilet
- Modern kitchen with cooking island, granite worktop and induction hob
- Separate laundry room / storage room
- Elevator in every building
- Excellent rental potential
General facilities
- Large communal swimming pool
- Mini padel court
- Mini basketball court
- Fitness room
- Ample parking
- 24/7 security
Thanks to its complete turnkey delivery, high-quality finishes and central location, Metro Residences is ideal for both private occupancy and long- and short-term rental, with excellent return prospects.
Prices from: XCG 470,000
Expected delivery: Q3 2027